Non-Compliance detail


  
Summary
 
Licence number: 2094
Annual Return Start: 30 Jun 2022
Annual Return End: 29 Jun 2023
Date Received: 25 Aug 2023
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M9.1 and M7.1 Monitoring Point 6 (HRSTS discharge point) failed to monitor continuously during discharge in accordance with Condition M2.3 and M7.1 due to equipment failure. EPA action determined as part of scheduled inspection program 1
M2.2 Monitoring Point 12 (SX38-D6) failed to monitor PM10 continuously in accordance with Condition M2.2 during the reporting period due to equipment malfunction or planned maintenance activities. EPA action determined as part of scheduled inspection program 6
M2.2 Monitoring Point 11 (SX38-D5) failed to monitor PM10 continuously in accordance with Condition M2.2 during the reporting period due to equipment malfunction or planned maintenance activities. EPA action determined as part of scheduled inspection program 5
M2.2 Monitoring Point 10 (SX38-D4) failed to monitor PM10 continuously in accordance with Condition M2.2 during the reporting period due to equipment malfunction or planned maintenance activities. EPA action determined as part of scheduled inspection program 8
M2.2 Monitoring Point 9 (SX38-D3) failed to monitor PM10 continuously in accordance with Condition M2.2 during the reporting period due to equipment malfunction or planned maintenance activities. EPA action determined as part of scheduled inspection program 8